Physical dimensions/space needed to operate?
Posted: Sun Aug 28, 2016 9:30 pm
I ordered an M2 last week and I need to get a table to put it on before it gets here. Space is a bit limited, and I'm wondering how big of an area is needed for the unit to work, including the space needed behind/in front of the unit to account for the build plate movement. Could someone give me a rough estimate for a minimum workbench depth?
Thanks!
Thanks!